Main content
Penrith M6 opens 13 hours early
The West Coast Mainline railway bridge at Clifton was moved into place ahead of schedule. This once in a lifetime spectacle was watched by local people, who have suffered disruption as a consequence of the engineering works. Train services will resume on Thursday after the track is reinstated. Photo - Network Rail
Duration:
This clip is from
More clips from BBC RADIO CUMBRIA
![]()
Protect Our Periods: Meet the 12-year-old driving change
Duration: 09:46
![]()
Ben Stokes retires: his first cricket club pays tribute
Duration: 06:19
![]()
The missing Penrith treasure mystery
Duration: 04:58
![]()
In Dave's Footsteps: A Day in Barrow with Lili Myers
Duration: 10:34





